An animation has not been loaded. This is probably due to the absence of the Flash Player plug–in on the system you are currently using. Consequently, the animation has been replaced by a still image.
Projects: Urban and Rural Development, Infrastructure.

References

  • AVENTIS
  • CONSEIL GÉNÉRAL DE LA NIÈVRE
  • CONSEIL GÉNÉRAL DE L’ESSONNE
  • CONSEIL GÉNÉRAL DE L’ARDECHE
  • G.T.M.
  • MAIRIE D’ÉPINAY SUR ORGE
  • MAIRIE DE BELFORT
  • MAIRIE DE BLAGNAC
  • MAIRIE DE BRÉTIGNY SUR ORGE
  • MAIRIE D’OZOIR LA FERRIÈRE
  • MULTIPÔLE DE L’ÉTANG DE BERRE
  • ONDÉO DEGREMONT
Aventis, Vitry–sur–Seine

Aventis, Vitry–sur–Seine

Sextius Parking Garage, Aix–en–Provence

Sextius Parking Garage

Val d’Europe RER train station

Val d’Europe RER train station

Aventis

Design and construction of a parking garage

  • Net area: 11,600 m².
  • Project type: Design and construction of a private parking garage of 448 spaces on five levels for the Aventis Research Centre in Vitry Alfortville (94).
  • Date of completion: 2005.
  • Contracting authority: Aventis Pharma.
  • Architect: Cabinet Beguin–Macchini.
  • Gross value: € 4 million.
  • Assignment: Complete and economic contracting.

Special features:

This new parking garage project is located in the heart of a pharmaceutical research and production site.

Aventis Aventis Aventis