L’Oréal–Soproréal
ADF production laboratory in Aulnay–sous–Bois (93)
- Net area: 700 m².
- Project type: Anti–deflagration workshop for the production of cosmetics. Includes a single–level technical gallery.
- Date of completion: 2002 / 2003.
- Contracting authority: L’Oréal–Soproréal.
- Architect: SLA Architecture.
- Gross value: € 2,5 million.
- Assignment: Complete supervision of contracts.
Special features:
Design and construction of a high–risk facility within a production factory. Other projects have been executed for L’Oréal–Soproréal in Aulnay–sous–Bois, notably the construction of a security guard post in 2004, a restructuring of a logistics platform in 2003, and an extension of an AC storage facility in 2002.